Completed Stairs at Costco Distribution Center

Our Pacific Ironworks division recently completed the installation of a staircase at the Costco Distribution Center being built in Tumwater. The Costco Distribution center is a 1.1M square foot facility, located on 79 acres, developed by CRG and being constructed by Clayco Construction.

Pacific Ironworks is contracted with Clayco Construction to fabricate and install the misc. metals for the Costco Distribution Center project.